Skip to content
Monday – Friday: 6:30 a.m. – 5:00 p.m. · Saturday: 7:00 a.m. – 12:00 p.m. · Sunday: ClosedMonday – Friday: 6:30 a.m. – 5:00 p.m.Home improvement contractor · PA Registration 000000General liability · Your carrier's name goes here
1 more license
  • Home improvement contractor · PA Registration 000000
  • General liability · Your carrier's name goes here

Farm work

Grain bin, dryer and feed mill wiring

A bin is a motor, a fan and a ladder away from the panel. We wire the whole path so the dryer, leg and augers start in order and stop together.

We wire bins, dryers, grain legs, augers, aeration fans, bin sweeps, moisture and temperature cables, feed mills and bulk feed bins.

What we do

  • A disconnect within sight of each motor

  • Starters and controls labeled and drawn on one page

  • Dust-tight boxes and fittings in the bin area

Two new steel grain bins with a flag on top beside a green crop field

When to call

Signs the bins need a look

Call in summer if you see any of these. Bin jobs fill up before September.

  • A new bin or dryer is coming

    The wire, the starter and the disconnect should be planned before the equipment is on the truck.

  • Motors that trip on startup

    A leg or fan that kicks a breaker as it starts usually has a feed or a starter that is too small.

  • Extension cords on the bin fans

    Fans run for days. They belong on a fixed circuit with a disconnect.

  • An auger or sweep with no working disconnect

    If you can't shut it off at the machine, it isn't ready for harvest.

  • A burnt smell at a starter or disconnect

    Turn it off if it is safe to, keep people away, and call us.

  • Three-phase equipment on single-phase power

    There are a few ways to solve that. We lay out each one and what it costs to run.

The visit

What a grain job includes

We start from the bin plan, so the electrical goes in the order the equipment does.

  1. 01

    Step 1: Walk the site with the plan

    We look at the pad, the path of the legs and augers, and the distance from the service.

  2. 02

    Step 2: Size the service and the run

    We add up the motors that run at once and size the feeder to them.

  3. 03

    Step 3: Write the estimate and the order

    It lists each bin, the dryer and the controls, with the days we need on site.

  4. 04

    Step 4: Wire it up

    Conduit and boxes go in first, so the equipment crew can set machines without waiting.

  5. 05

    Step 5: Start up with the installer

    We coordinate with the equipment installer, so the dryer starts once and starts right.

  6. 06

    Step 6: Label and draw

    Every starter and disconnect is labeled, and you keep a one-page drawing.

Pricing

What changes the price on a grain job

Three things move it most.

  • The number of bins and the distance between them

    Each bin needs its own feed and disconnect, and distance adds wire and trench.

  • Three-phase power or a converter

    Whether the utility can bring three-phase, or a converter makes more sense, changes the plan and the monthly cost.

  • Dryer and leg motor size

    Larger motors mean larger starters and a larger feed.

Questions about grain work

Can you do it before harvest?

Book in summer. Bin and dryer jobs fill the schedule before September, and we'd rather tell you the dates early.

Can you work with the dryer installer?

Yes. We coordinate with the installer for the hookup, and we want the dryer's controls on a clean feed.

What about the dust?

We use sealed, dust-tight boxes and fittings in the bin area, and we keep fixtures out of the dustiest spots.

Put your bins on our schedule

Tell us how many bins and what dryer. We'll find a day before the first load.